
Field views supplied for a blueberry base in Honghe, showing pretreatment vessels, RO housings, pumps, controls and storage connections. Includes practical questions on supply interfaces and water used before nutrient preparation.
Transport and on-site records are kept distinct
The supplied photograph records equipment and materials on a vehicle. The two clips show equipment within a growing structure, including pretreatment vessels, membrane housings and connected pipework. Their order is not used to infer installation or acceptance dates. The public page uses people-free video views; the transport photograph with recognizable faces remains local.
What the equipment views establish
The footage gives several views of vessels, the pump, RO housings, gauges and controls, with storage facilities visible alongside. It helps discuss layout and interfaces. It does not establish the membrane brand, designed hourly production, land area or measured water-quality results.
Prepare water data before selecting equipment
Provide the source-water report, seasonal variation, growing medium, nutrient-preparation arrangement, daily demand and irrigation peaks. Label source water, treated preparation water and the final nutrient solution separately. Check the interfaces between treatment, storage, nutrient preparation and irrigation with the grower and equipment provider.
Additional actual equipment view

Evidence still needed
No project-specific water test, production-capacity measurement or final acceptance record has been supplied for this Honghe case. The Dali canteen report belongs to a different case and is not used as evidence here. Customer identity, precise address and performance outcomes are not inferred.
Field-record directory · Related equipment scope · Discuss your actual requirements