- 01Project location
- Prefecture or city, district or county, intake point, equipment installation location, and whether different locations are involved. Do not upload identity documents or customer lists for an initial inquiry.
- 02Water source and testing
- Tap water, well water, surface water, or other sources; record sampling points, dates, testing organizations, and the report's applicable scope. Do not infer water quality from a city name.
- 03Treated-water use
- Production, cleaning, cultivation, drip irrigation, or other uses; provide the corresponding process, crop, or actual usage requirements. Acceptance requirements may differ by use.
- 04Demand and schedule
- Daily demand, peak hourly demand, permitted operating time, and storage arrangements. Mark values for confirmation when measured data are unavailable. Estimates must not be recorded as equipment guarantees.
- 05Equipment and site
- Existing equipment models, consumable specifications, power supply, space, drainage, operating environment, and site-access conditions. Equipment photos should avoid capturing personal or confidential information.
- 06Budget and delivery
- Specify the budget, supply list, transportation, unloading, installation, commissioning, acceptance, and after-sales scope. Timing and expenses are governed by the confirmations for this project.
- 07Plateau site and water temperature
- Actual installation altitude, seasonal feed-water temperatures, pump inlet pressure or water level, suction piping and power; review the specific model. Altitude is not a water-quality test.
- 08Sampling points and operating baseline
- Sampling locations, dates, units, temperature compensation, and normal and abnormal records. Keep raw water, treated water, nutrient solution and return water separate.
Step 1Organize requirements remotely
Submit intended use, raw-water, demand, equipment, and location information. Clearly mark missing items.
Step 2Check processes and provisions
Confirm feasibility using the relevant product documents, tests, and site conditions, and discuss the budget and necessary configuration.
Step 3Confirm the site and delivery
Confirm transportation, installation, personnel, expenses, timing, acceptance, and maintenance responsibilities separately. Unconfirmed matters are not commitments.