Technical articles and news

Understand the requirements for equipment selection and maintenance handover, and download practical checklists.

Technical articles and news 199169–176

If a translation is unavailable, the original Chinese text is shown. Contact us for help with technical details.Contact & inquiries ↗
How to keep records after opening water treatment consumables

How to keep records after opening water treatment consumables

If consumables have been opened but are not yet in use, first find the storage instructions for the specific product and record its condition. Requirements may differ by material, packaging, and storage method, so one fixed period cannot cover every product.

View details
Find maintenance records before bringing equipment back into use

Find maintenance records before bringing equipment back into use

After restarting water purification equipment that has been out of use, is it ready to use simply because water comes out? That alone is not enough.

View details
Check the existing purification configuration before adding water outlets in a restaurant

Check the existing purification configuration before adding water outlets in a restaurant

When a restaurant adds an ice machine, beverage equipment, or other points of use, the existing water purification configuration needs to be reassessed. Normal power-on operation of the existing equipment does not establish that all new uses can be connected directly.

View details
Specify the scope of work in a maintenance budget

Specify the scope of work in a maintenance budget

How much does a year of water purification equipment maintenance cost? A total figure given without scope and conditions may not explain the cost clearly.

View details
School water purification maintenance handovers need more than a phone number

School water purification maintenance handovers need more than a phone number

When a school changes the people managing its water purification equipment or adjusts maintenance arrangements, the handover should cover equipment information, maintenance, and outstanding tasks as well as contact details. This helps the next discussion locate the relevant documents.

View details
Confirm the location and responsibilities before installation and commissioning

Confirm the location and responsibilities before installation and commissioning

What exactly is included in installation and commissioning in a water treatment equipment quotation?

View details
What contractors should organize before forwarding water treatment requirements

What contractors should organize before forwarding water treatment requirements

When a contractor or distributor needs a supplier's help with equipment provision, start with a summary of requirements. Clearly describing the intended use and items pending confirmation makes further discussion easier than simply forwarding a request for a price.

View details
Confirm trial orders and agency authorization separately

Confirm trial orders and agency authorization separately

For a water treatment distribution partnership, starting with one specific requirement makes it easier for both parties to clarify their responsibilities.

View details
Contact & inquiries

Tell us about your water needs

Describe your water source, intended use, and water demand so technical staff can prepare advice.

Discuss your water treatment requirements ↗