← Knowledge and Information Center

Gudian Technology · Information template

Industrial RO Equipment Requirements Information Form

Before an inquiry, organize raw water, product water uses, daily consumption and peak demand, target parameters, and site conditions separately. Then check configuration and delivery scope.

Enter known information and mark missing items pending confirmation. Complete this form locally; it is not uploaded automatically. Before submission, obscure information unrelated to this inquiry.

Check itemInstructionsKnown information or items pending confirmation
Project city and applicationState the actual location and uses such as cleaning, solution preparation, or makeup water 
Raw water and reportsWater source, sampling location, date, and available test information; mark missing items pending confirmation 
Daily consumption m³/dayRecord separately from peak hourly demand 
Peak demand m³/hourState simultaneous water use arrangements and operating duration 
Target parameters and basisParameters, units, downstream equipment requirements, and acceptance methods 
Site coordinationPower, inlet and drainage connections, space, storage, and transportation routes 
Quote scopeConfirm pretreatment, main unit, piping, transportation, installation and commissioning, and testing separately 

Download blank CSV form · Read full instructions