← Knowledge and Information Center

Gudian Technology · Information template

Commercial Purification Point-of-Use Survey

Survey demand by points of use, downstream equipment requirements, and peak periods. Define raw water, installation space, maintenance, and testing responsibilities together.

Enter known information and mark missing items pending confirmation. Complete this form locally; it is not uploaded automatically. Before submission, obscure information unrelated to this inquiry.

Check itemInstructionsKnown information or items pending confirmation
City and settingHotel, food service, or school; state the actual application 
Location and floorPosition, equipment name, and downstream water use description 
Peak arrangementsEnter periods, simultaneous use, and daily totals separately 
Raw-water informationWater source, sampling location, date, and known test information 
Site conditionsPower, inlet and drainage connections, piping, storage, and service clearance 
Management responsibilitiesRoles responsible for inspection, maintenance, records, and necessary testing 

Download blank CSV form · Read full instructions